Case Study
How Abilene Hargesheimer Water Treatment Plant Reaches Overall Recovery of 96%.
IDE Team
Water security has always been a priority for Abilene, TX.
The Abilene Hargesheimer Water Treatment Plant receives brackish water from a lake, which it desalinates using a 3-stage BWRO system with a recovery of 80%. The goal was to use IDE’s PFRO single-stage technology to achieve an additional 80% recovery of rejected brine from the 3-stage conventional BWRO to reach an overall recovery of 96%.
Download the free case study to learn more about reaching high recovery levels while increasing the plant permeate production to levels that were not achievable with standard RO systems.
Enter your details to download the case study
Fields marked with * are mandatory